UA1000369_Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of Gas Distribution Pipelines of PJSC “Lubnygaz”
UA1000369: Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of Gas Distribution Pipelines of PJSC “Lubnygaz” | |||
Last updated | 05.02.2013 | ||
ITL project ID | UA1000369 | ||
Project title | Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of Gas Distribution Pipelines of PJSC “Lubnygaz” | ||
Project location | Lubny town and the territories adherent to the town of the Poltava Region of Ukraine | ||
Host Party | Ukraine | ||
Other Party | Switzerland | ||
Type of Project | Large Scale | ||
Fee to be paid | 20,000 USD | ||
Sectoral scope(s) | 10: Fugitive emissions from fuels (solid, oil and gas) | ||
"Track" | 1 | ||
LULUCF project | No | ||
Total Emission reductions expected | 545385.0 t CO2 equivalent | ||
Crediting period | 01 Jan 2008 - 31 Dec 2012 | ||
Project information provided by host Party | The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 165 dated August 03, 2012 | ||
External link(s) to project information: | http://ji.unfccc.int/JIITLProject/DB/FF087OYETX4P3JBZKYJUMKNQHGW4DU/details | ||
Current status of the project | Operational | ||
Total verified emission reductions | 474774.0 t CO2 equivalent | ||
|
N | Назва файлу | Опис | Дата |
1. | UA1000369APRSWI20072012EN.pdf | Approval Switherland | 20.07.2012 |
2. | UA1000369APRUKR03082012UA.pdf | Approval Ukraine | 03.08.2012 |
3. | UA1000369DET10072012EN.pdf | Determination Report (English language) | 10.07.2012 |
4. | UA1000369DET10072012UA.pdf | Determination Report (Ukrainian language) | 10.07.2012 |
5. | UA1000369MON06082012EN_01012008-30062012.pdf | Monitoring report - period 01.10.2008-30.06.2012 (English language) | 06.08.2012 |
6. | UA1000369MON06082012UA_01012008-30062012.pdf | Monitoring report - period 01.10.2008-30.06.2012 (Ukrainian language) | 06.08.2012 |
7. | UA1000369MON12122012EN_01072012-30112012.pdf | Monitoring report - period 01.07.2012-30.11.2012 (English language) | 12.12.2012 |
8. | UA1000369MON12122012UA_01072012-30112012.pdf | Monitoring report - period 01.07.2012-30.11.2012 (Ukrainian language) | 12.12.2012 |
9. | UA1000369PDD22062012EN.pdf | Project Design Document (English Language) | 22.06.2012 |
10. | UA1000369PDD22062012UA.pdf | Project Design Document (Ukraine language) | 22.06.2012 |
11. | UA1000369VER08082012EN_01012008-30062012.pdf | Verification report - period 01.10.2008-30.06.2012 (English language) | 08.08.2012 |
12. | UA1000369VER08082012UA_01012008-30062012.pdf | Verification report - period 01.10.2008-30.06.2012 (Ukrainian language) | 08.08.2012 |
13. | UA1000369VER17122012EN_01072012-30112012.pdf | Verification report - period 01.07.2012-30.11.2012 (English language) | 17.12.2012 |
14. | UA1000369VER17122012UA_01072012-30112012.pdf | Verification report - period 01.07.2012-30.11.2012 (Ukrainian language) | 17.12.2012 |