UA1000465_Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Kharkivgaz”
UA1000465: Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Kharkivgaz” | |||
Last updated | 06.02.2013 | ||
ITL project ID | UA1000465 | ||
Project title | Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Kharkivgaz” | ||
Project location | Kharkiv city and adherent to the city territories of the Kharkiv Region of Ukraine | ||
Host Party | Ukraine | ||
Other Party | Switzerland | ||
Type of Project | Large Scale | ||
Fee to be paid | 20,000 USD | ||
Sectoral scope(s) | 10: Fugitive emissions from fuels (solid, oil and gas) | ||
"Track" | 1 | ||
LULUCF project | No | ||
Total Emission reductions expected | 4057661.0 t CO2 equivalent | ||
Crediting period | 01 Jan 2008 - 31 Dec 2012 | ||
Project information provided by host Party | http://ji.unfccc.int/JIITLProject/DB/PEP7AN4F9X89L9CP30989R9RBVZ08F/details | ||
External link(s) to project information: | The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 347 dated November 13, 2012 | ||
Current status of the project | Operational | ||
Total verified emission reductions | 0.0 t CO2 equivalent | ||
Additional information (as appropriate) |
№ | Назва файлу | Опис | Дата |
1. | UA1000465APRSWI24102012EN.pdf | Approval Switherland | 24.10.2012 |
2. | UA1000465DET15102012EN.pdf | Determination Report (English language) | 15.10.2012 |
3. | UA1000465DET15102012UA.pdf | Determination Report (Ukrainian language) | 15.10.2012 |
4. | UA1000465MON08112012EN_01012008-31102012.pdf | Monitoring report - period 01.01.2008-31.10.2012 (English language) | 08.11.2012 |
5. | UA1000465MON08112012UA_01012008-31102012.pdf | Monitoring report - period 01.01.2008-31.10.2012 (Ukrainian language) | 08.11.2012 |
6. | UA1000465MON29082013EN_01112012-31122012.pdf | Monitoring report - period 01.11.2012-31.12.2012 (English language) | 29.08.2013 |
7. | UA1000465MON29082013UA_01112012-31122012.pdf | Monitoring report - period 01.11.2012-31.12.2012 (Ukrainian language) | 29.08.2013 |
8. | UA1000465PDD08102012EN.pdf | Project Design Document (English Language) | 08.10.2012 |
9. | UA1000465PDD08102012UA.pdf | Project Design Document (Ukrainian Language) | 08.10.2012 |
10. | UA1000465VER03092013EN_01112012-31122012.pdf | Verification report - period 01.11.2012-31.12.2012 (English language) | 03.09.2013 |
11. | UA1000465VER03092013UA_01112012-31122012.pdf | Verification report - period 01.11.2012-31.12.2012 (Ukrainian language) | 03.09.2013 |
12. | UA1000465VER09112012EN_01012008-31102012.pdf | Verification report - period 01.01.2008-31.10.2012 (English language) | 09.11.2012 |
13. | UA1000465VER09112012UA_01012008-31102012.pdf | Verification report - period 01.01.2008-31.10.2012 (Ukrainian language) | 09.11.2012 |