UA1000298_Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Plants, Gas Armature, Flanged and Threaded Connections of Gas Distribution Networks of PJSC "Vinnitsagaz"

UA1000298: Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Plants, Gas Armature, Flanged and Threaded Connections of Gas Distribution Networks of PJSC "Vinnitsagaz"
Last updated
05.02.2013
ITL project ID UA1000298
Project title Reduction of Methane Emissions on the Gas Equipment of Gas Distribution Plants, Gas Armature, Flanged and Threaded Connections of Gas Distribution Networks of PJSC "Vinnitsagaz"
Project location Vinnitsa Region of Ukraine
Host Party Ukraine
Other Party Estonia 
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 10: Fugitive emissions from fuels (solid, oil and gas)
"Track" 1
LULUCF project No
Total Emission reductions expected 3745709.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 166 dated October 05, 2011
Current status of the project Operational
Total verified emission reductions 2422190.0 t CO2 equivalent
Additional information (as appropriate)  
N Назва файлу Опис Дата
 1. UA1000298APREST05102011EN.pdf Approval Estonia 05.10.2011
 2. UA1000298APRUKR04102011UA.pdf Approval Ukraine 04.10.2011
 3. UA1000298DET26092011EN.pdf Determination Report (English language) 26.09.2011
 4. UA1000298DET26092011UA.pdf Determination Report (Ukrainian language) 26.09.2011
 5. UA1000298MON05102011EN_01012008-30092011.pdf Monitoring report - period 01.01.2008-30.09.2011 (English language) 05.10.2011
 6. UA1000298MON05102011UA_01012008-30092011.pdf Monitoring report - period 01.01.2008-30.09.2011 (Ukrainian language) 05.10.2011
 7. UA1000298MON11092012EN_01102011-31082012.pdf Monitoring report - period 01.10.2011-31.08.2012 (English language) 11.09.2012
 8. UA1000298MON11092012UA_01102011-31082012.pdf Monitoring report - period 01.10.2011-31.08.2012 (Ukrainian language) 11.09.2012
 9. UA1000298PDD23092011EN.pdf Project Design Document (English Language) 23.09.2011
 10. UA1000298PDD23092011UA.pdf Project Design Document (Ukrainian Language) 23.09.2011
 11. UA1000298VER05102011EN_01012008-30092011.pdf Verification report - period 01.01.2008-30.09.2011 (English language) 05.10.2011
 12. UA1000298VER05102011UA_01012008-30092011.pdf Verification report - period 01.01.2008-30.09.2011 (Ukrainian language) 05.10.2011
 13. UA1000298VER13092012EN_01102011-31082012.pdf Verification report - period 01.10.2011-31.08.2012 (English language) 13.09.2012
 14. UA1000298VER13092012UA_01102011-31082012.pdf Verification report - period 01.10.2011-31.08.2012 (Ukrainian language) 13.09.2012