UA1000407_Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Zakarpatgas”

UA1000407: Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Zakarpatgas”
Last updated 05.02.2013
ITL project ID UA1000407
Project title Reduction of Methane Leaks on the Gas Equipment of the Gas Distribution Points and on the Gas Armature, Flanged, Threaded Joints of the Gas Distribution Pipelines of PJSC “Zakarpatgas”
Project location Uzhgorod city, towns and villages of the Zakarpattia Region of Ukraine
Host Party Ukraine
Other Party Switzerland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 10: Fugitive emissions from fuels (solid, oil and gas)
"Track" 1
LULUCF project No
Total Emission reductions expected 1688463.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 240 dated October 02, 2012
External link(s) to project information: http://ji.unfccc.int/JIITLProject/DB/EOISVDEOINR2QEWR9ACB3BO7MZUBTS/details
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)

 

Назва файлу Опис Дата
 1. UA1000407APRSWI21092012EN.pdf Approval Switherland 21.09.2012
 2. UA1000407APRUKR05092012UA.pdf Approval Ukraine 05.09.2012
 3. UA1000407DET15082012EN.pdf Determination Report (English language) 15.08.2012
 4. UA1000407DET15082012UA.pdf Determination Report (Ukrainian language) 15.08.2012
 5. UA1000407MON12122012EN_01072012-30112012.pdf Monitoring report - period 01.07.2012-30.11.2012 (English language) 12.12.2012
 6. UA1000407MON12122012UA_01072012-30112012.pdf Monitoring report - period 01.07.2012-30.11.2012 (Ukrainian language) 12.12.2012
 7. UA1000407MON24092013EN_01122012-31122012.pdf Monitoring report - period 01.12.2012-31.12.2012 (English language) 24.09.2013
 8. UA1000407MON24092013UA_01122012-31122012.pdf Monitoring report - period 01.12.2012-31.12.2012 (Ukrainian language) 24.09.2013
 9. UA1000407MON25092012EN_01012008-30062012.pdf Monitoring report - period 01.01.2008-30.06.2012 (English language) 25.09.2012
 10. UA1000407MON25092012UA_01012008-30062012.pdf Monitoring report - period 01.01.2008-30.06.2012 (Ukrainian language) 25.09.2012
 11. UA1000407PDD14082012EN.pdf Project Design Document (English Language) 14.08.2012
 12. UA1000407PDD14082012UA.pdf Project Design Document (Ukrainian Language) 14.08.2012
 13. UA1000407VER17122012EN_01072012-30112012.pdf Verification report - period 01.07.2012-30.11.2012 (English language) 17.12.2012
 14. UA1000407VER17122012UA_01072012-30112012.pdf Verification report - period 01.07.2012-30.11.2012 (Ukrainian language) 17.12.2012
 15. UA1000407VER27092012EN_01012008-30062012.pdf Verification report - period 01.01.2008-30.06.2012 (English language) 27.09.2012
 16. UA1000407VER27092012UA_01012008-30062012.pdf Verification report - period 01.01.2008-30.06.2012 (Ukrainian language) 27.09.2012
 17. UA1000407VER27092013EN_01122012-31122012.pdf Verification report - period 01.12.2012-31.12.2012 (English language) 27.09.2013
 18. UA1000407VER27092013UA_01122012-31122012.pdf Verification report - period 01.12.2012-31.12.2012 (Ukrainian language) 27.09.2013